EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
DR_DAVE'S_RV-10
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (111)
Research
- (1)
Tools
Workshop
- (2)
Tail Feathers
- (83)
Empennage
- (6)
Fuselage
Firewall
Wings
- (2)
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
- (2)
Inspection
Misc.
- (14)
-
Been on the road
-
Van's Laser Drill...
-
Van's Laser Drill...
-
Oshkosh 2023
-
Duramax LBZ all back...
-
Still rebuilding LBZ
-
Putting Engine back...
-
Taking a break for a...
-
In Europe for a...
-
Back from OSH
-
Conversion Coating
-
Conversion Coating -...
-
Alodine Work Area
-
Inventory
Mis-Steakz
- (1)
Builder Name:
DAVE LEHMAN
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
452.1
Total Flight Time:
Start/Last Date:
Oct 01, 2020 - Feb 03, 2026
Friendly URL:
https://eaabuilderslog.org?s=DR_DAVE'S_RV-10
Home or Last Project Picture
Apr 05, 2023
Still rebuilding LBZ
Category: Misc.
OK. Turbocharger overhauled, new billeted compressor wheel. Have the new heads installed, the valve-lash adjusted, valve covers back on and the new injectors and glow plugs with a new high-pressure fuel rail assembly installed. Y-Bridge intake (red) was also installed, but had to replace OEM nuts with SS allen hex head screws and grind down the head of the aft passenger side screw to clear the compressor housing. I'm on the road flying now but back end of week (15-APR)
Turbo Rebuild Supplies
Also refinished reluctor surfaces
New 11-Blade Compressor Wheel
Compressor Cover Installed
Turbine Side
New Up-Pipes and Downpipes
Strapped due to Earthquake Propensity
Turbo Reinstalled
Exhaust Manifold on Driver Side Head
1 stud bolt in position with tie wrap
ARP Studs
Thread chased stud holes
Mahle Type C Gaskets
Head in place
42/85/125 ft-lbs torque steps
Ready for Valve Lifters reinstallation
Valve assembly back in
Valve Lash @ 0.012 "
Lash Adjustment Procedure
Lash Adjustment Cheat Sheet
Valve Covers ready
Valve Covers back on
Injectors and Fuel Rail back on
Glow plugs and Y-Bridge installed
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.